Use this block to describe what the course is about, what your students will learn and why someone should buy your course.
Course Curriculum
Available in
days
days
after you enroll
Available in
days
days
after you enroll
- 1.Introduction to Real-4 Software (15:01)
- 2.Real4 and Related Knowledge (6:43)
- 3.How to learn Real-4 (7:09)
- 4.Project-1 Intro (3:19)
- 5.Project-1 Drawing Intro (2:12)
- 6.Project Information (36:47)
- 7.Create Grids (9:35)
- 8.Create Floors (9:01)
- 9.Register Columns (10:13)
- 10.Register Prob Columns (5:28)
- 11.Register Griders (12:22)
- 12.Register Secondary Beams (3:20)
- 13.Register Brace (7:25)
- 14.Create Plates (7:07)
- 15.Register Joints (9:57)
- 16.Register Base Plate (8:45)
- 17.Check any mistakes we can make (12:47)
- 18.Grid Offsets for Column Locations (5:33)
- 19.Place Columns (5:34)
- 20.Place Girders (6:31)
- 21.Place Cantilever Beams (6:51)
- 22.Place Secondary Beams (9:15)
- 23.Fix Gusset Plate Position (4:34)
- 24.Place Small Columns (2:25)
- 25.Copy members to another floor (2:50)
- 26.Rename members according to the floor codes (3:50)
- 27.Place Remaining Secondary Beams in Roof Level (3:42)
- 28.Add Slopes (11:35)
- 29.Lift 50mm to B3 beams (4:34)
- 30.Place Bracings (18:39)
- 31.Copy and Mirror Bracings (10:41)
- 32.Import Project File and Generate 3D (1:59)
- 33.Numbering_Part-1 (12:47)
- 34.Numbering_Part-2 (10:39)
- 35.Generate Drawings (17:06)
Available in
days
days
after you enroll
Available in
days
days
after you enroll
- 1.Intro (2:39)
- 2.Flow of Input Procedures (17:41)
- 3.Step1. 工事を準備します (2:29)
- 4.Step2. 建物の通り・階高を入力します (12:13)
- 5.Step-2 階高を作成 (5:20)
- 6.本柱を作成 (15:52)
- 7.間柱を作成 (5:50)
- 8.大梁を作成 (15:24)
- 9.小梁を作成 (5:20)
- 10.Joint Connection-1 (16:35)
- 11.Joint Connection-2 (26:59)
- 12.Joint Connection-3 (12:13)
- 13.Base Plate Connection (12:13)
- 14.Create Plates (12:13)
- 15.Add guide lines for placing Columns and Beams (3:00)
- 16.Create Columns C1 and C2 (10:32)
- 17.Girders in Z1 Floor (11:40)
- 18.Intermediate Columns in Z1 Floor (12:02)
- 19.Secondary Beams in Z1 Floor (5:55)
- 20.G1,G2 and 2CG1 Beams in 2SL (12:03)
- 21.Remaining Beams in 2SL (10:44)
- 22.Register one more Beam to Beam Joint Connection (11:31)
- 23.Beam to Beam Connection Placement and Error Finding (15:47)
- 24.Place Girders and Cantilever Beams on RSL Floor (13:35)
- 25.Place RB3 Beams using Auxiliary Lines (6:09)
- 26.Place all remaining secondary beams (11:03)
- 27.Step-5 Place Stud Columns (33:01)
- 28.Connection Plate and Gusset Support to Stud Column (26:35)
- 29.Adding Slopes (21:30)
- 30.Bracing Supports at X2 and X3 Grids (12:11)
- 31.Register V1,V2 and V3 (7:36)
- 32.Register Gusset Plate Connections (10:11)
- 33.Place horizontal bracings on 2SL floor (7:06)
- 34.Diagonal Bracings on X4 Grid (9:25)
- 35.Bracings on X2 and X3 (6:18)
- 36.Diagonal Bracings on Y2 (5:50)
- 37.Change connections on M-Grid (5:27)
- 38.梁に個別にハンチを設定します (6:13)
- 39.Change Corner Beams Connections (6:06)
- 40.母屋を作成(Create Purlin) (6:43)
- 41.Connection Plates (15:01)
- 42.F1 and F2 Plates (2:17)
- 43.Place Purlins on n1 and n3 grids (9:22)
- 44.Modify end points of purlins (5:11)
- 45.Place Purlins on R1 Side (9:26)
- 46.Support Plate Connections (11:25)
- 47.Connection Plates (7:06)
- 48.Support Plates on Main Purlins (9:09)
- 49.Adding Curtain Wall Data (13:52)
- 50.Adding Support Data (12:13)
- 51.Adding Window,Door Frame Spacing and Plate Data (10:29)
- 52.Create Curtain Wall Surface Position (7:36)
- 53.Horizontal and Vertical Wall Posts (7:47)
- 54.Fix all errors and add mullions, Window Frames (30:19)
- 55.Creating Wall Posts in X4 Grid (12:13)
- 56.Step-15 Step 2 to 4 (7:14)
- 57.Step-16 Part-3.1 (8:36)
- 58.Step-16 Part-3.2 (3:45)
- 59.Step-16 Part-3.3 (4:29)
- 60.Step-16 Part-3.4 (2:07)
- 61.Step-17.1 (9:05)
- 62.Step-17.2 (1:48)
- 63.Step-17.3 (2:28)
- 64.Step-18.1 (2:12)
- 65.Step-18.2 (1:06)
- 66.Step-18.3 (4:26)
- 67.Step-18.4,5 (4:53)

Hi, I’m [Your Name Here]
Use this block for your bio. Explain to your audience who you are, and why you’re teaching this course.

Use this for a heading.
Use this area for description text.

Use this for a heading.
Use this area for description text.

Use this for a heading.
Use this area for description text.